Designer Information Packet
The Designer’s Information Packet is used to provide electronic access to files and formats used during the design process. This information is intended to assist the Architect/Engineer (A/E) in doing business with the Division of Facilities Management, Design and Construction.
Table of Contents
- Summary of Changes
- Electronic Forms
- CADD Guidelines
- AE Evaluation Forms
- DNR Land Permit
- Division One Editable
- Roof Design Manual
- Design Guidelines
- Miscellaneous Attachments
- Deliverables Checklists
- Water Quality
Electronic Forms
- Professional Services Proposal
- Professional Services Statement
- Contract Change
- Request for Proposal
- RFP Log
- Designers Supplemental Instructions
- Designers Supplemental Instructions Log
- Request for Information
- Request for Information Log
CADD Guidelines
- AutoCADD Version 2002 Cover
- AutoCADD Version 2004 Cover
- AutoCADD Version 2002 Sheet
- AutoCADD Version 2004 Sheet
- CADD Guidelines
AE Evaluation Forms
- Design Interim Check
- End of Design or Study Evaluation
- Interim Construction Evaluation
- End of Construction Evaluation
- Agency Evaluation
- Project Rating Summary
DNR Land Permit
Division One Editables
- List of Drawings
- Summary of Work
- Allowances
- Unit Prices
- Alternates
- Coordination
- Contract Modification Procedures
- Submittals
- Submittals (easy submittals)
- Schedules-Bar Chart
- Schedules-CPM
- Construction Facilities and Temporary Controls
- Site Security and Health Requirements (Generic)
- Site Security and Health Requirements (OA)
- Site Security and Health Requirements (DOC)
- Site Security and Health Requirements (DESE)
- Site Security and Health Requirements (DMH)
- Site Security and Health Requirements (DYS)
- Cleaning
- Contract Change
- Designer's Supplemental Instructions
- Request for Information
- Request for Proposal
Roof Design Manual
- Asphalt Shingles
- Flat-Standing-Seam
- Structural Trapezoidal Standing-Seam
- EPDM Membrane
- Hybrid Modified Bitumin Roof System- MTL-WOOD-CONC
- Hybrid Modified Bitumin Roof System- Over LWIC-GYP DECK
- Preinstallation
- Product Substitution Request
- Product Substitution Request
- Roof Design Guidelines
- Roof Design Manual
- Roofing System Description
- Roofing System Description
Miscellaneous Attachments
- Seeding
- State Seal B&W
- State Seal
- Addendum Format
- Format for Construction Specifications
- Professional Seals Page
- Table of Contents
- Cost Estimate Detail
- Cost Estimate Summary - Example
- Project Completion Schedule - Example
- ASHRAE 90 Forms
- Final Payment for Design Constultant Report
- State of Missouri Space Standards Manual
- Agreement Between Owner and Consultant for Special Services
- Terms and Conditions of Special Service Agreement Between Owner and Consultant
- Agreement for Design Services Between Owner and Architect
- Terms and Conditions of Design Services Agreement Between Owner and Consultant
Deliverables Checklists
- Schematic Design Deliverables List
- Design Development Deliverable List
- Construction Documents Deliverable List
- Coordination Plan
- Bid Documents Deliverable List
- Record Drawing Documents Deliverable List