Bid Listing/ Electronic Plans (Projects Currently Bidding)
- To view detailed project information, in the information below click Invitation for Bid
Drawings may not be available when ads are published - To receive emails of Invitation for Bids for new projects, please register with our "Application for Construction Bidder's List"
- To view a list of plan holders, electronic plans, specifications and addenda for the project, Click
- To order Documents online (link is external) visit our Reprographic Center
- MBE/WBE Enterprise Program Directory
- SDVE MO OEO SDVE Certification Program
- SDVE Department of Veterans Affairs Directory
In most cases projects will be awarded within 20 working days from the date bids are due. Awards will be made to the lowest responsive, responsible bidder whose bid is within the available funds for the project. The Director reserves the right to waive informalities in bid submittals and to reject any or all bids.
Project Number | Project Title | Bid Date/ IFB/ RFQ/Electronic Plans | Bid Addendum(s) | Bid Results/ Awarded Contractor |
---|---|---|---|---|
O2354-01 |
Replace 13 Elevators and 6 Escalators |
1/9/2025 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
|
R2407-01 |
Replace Roof System & Selective Ceiling Demolition |
12/12/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results |
U2409-01 |
Design & Install Domestic Water Plant |
12/10/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Rejected |
X2408-01 |
Replace Highway AA Bridge |
12/5/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results |
C2405-01 |
Replace Fire Alarm Panels - Infrastructure |
12/3/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 |
Bid Results Awarded Contractor |
C2404-01 |
Replace Fire Alarm Panels - Infrastructure |
12/3/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results |
C2325-01 |
Replace Fire Alarm Systems - Multiple Assets |
11/21/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 |
Bid Rejected |
REBID C2330-01 |
REBID Replace Switchgear, Powerplant & Maintenance Building |
11/21/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results |
U2501-01 |
Replace Roof |
11/19/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
E2405-01 |
Improvements to Exterior and Replace VCT Flooring |
11/19/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
R2402-01 |
Renovate Women’s Locker Room |
11/19/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
M2301-03 |
St Louis Forensic Center South-ADA Upgrades, Cottages |
11/14/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
X2334-01 |
Sewer Renovations - Track Lagoon |
11/14/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
X2333-01 |
Sewer Renovations |
11/14/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
H2314-01 |
HVAC & BAS Replacement |
11/14/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 |
Bid Results Awarded Contractor |
F2302-01 |
Improvements to Storm Water and Wastewater Collection Systems |
10/31/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
M2301-02 |
Southeast MO Mental Health Center-ADA Upgrades, Group Homes |
10/31/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
C2329-01 |
Service Generator, Replace ATS & Recondition Switchgear |
10/31/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2301-01 Bid Pkg #6 |
New Laboratory Campus, Multi Agency, Jefferson City Bid Package #6 - Polished Concrete, General Trades, Tiling, Flooring, Painting, Epoxy, Operable Partition, Mobile Shelving, Window Coverings, Asphalt All bid documents may be viewed HERE All questions should be directed to McCownGordon Construction, Construction Manager At Risk. |
10/30/2024 |
|
|
M2301-01 |
Northwest MO Psychiatric Rehabilitation Center-ADA Upgrades, Multiple Cottages |
10/29/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2305-03 |
Water and Wastewater System Improvements |
10/29/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2306-03 |
Water & Wastewater Improvements |
10/24/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2305-04 |
Water and Wastewater System Improvements |
10/24/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
O2366-01 |
Install Emergency Generator |
10/24/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
M2415-01 |
Replace Inner Perimeter Fence, Administration Building |
10/24/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2307-02 |
Water and Wastewater Improvements |
10/17/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results |
X2322-02 |
Sewer System Improvements |
10/17/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2306-02 |
Water & Wastewater Improvements |
10/17/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2322-03 |
Sewer and Water Line Improvements |
10/15/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2321-01 |
Water & Wastewater Improvements |
10/15/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
N2301-01 |
Replace Rooftop Units 5-7-8-9 and Server Room Air Conditioners |
9/26/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2301-01 |
Water and Sewer Improvements |
9/24/2024 Bid Forms Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
O2440-01 |
Replace HVAC, Structural Repairs & Replace Roof |
9/19/2024 Invitation for Bid Plans Volume 1, Plans Volume 2, Plans Volume 3 Specifications Volume 1, Specifications Volume 2, Specifications Volume 3 |
Addendum #1 |
Bid Results Awarded Contractor |
R2320-01 |
Install Transfer Switch, Annex Building |
9/19/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2336-01 |
Water Storage Tank and Well House Renovations |
09/19/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2315-01_ |
Construct Four New Yurts |
9/17/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
X2335-01 |
Water Renovations |
09/17/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2364-01_ |
Repave Parking Lot |
9/17/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
R2338-01 |
Crime Lab-Exterior Renovations |
9/12/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
M2408-01 |
Replace Concrete Dock & Entryway
|
9/12/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
C2318-02 |
Water and Sewer Improvements |
9/12/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2326-01 |
Renovate Interior & Exterior |
9/12/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Rejected |
O2301-01 Bid Pkg #3- |
New Laboratory Campus, Multi Agency, Jefferson City Bid Package #3 - Drywall & Ceilings; Walk in Coolers / Freezers; Laboratory Casework & Equipment; All bid documents may be viewed HERE All questions should be directed to McCownGordon Construction, Construction Manager At Risk. |
9/11/2024 |
|
|
X2311-01 |
Install Pedestrian Bridge At Pleasant Hill Over Union Pacific Railroad |
9/10/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2329-01 |
HVAC Repairs, Blade & Paint Shop Building |
9/10/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
U2302-02 |
Minor Renovations for Infection Control |
9/10/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2319-01 |
Renovate Cabins 1-4, 14, & 19 |
9/10/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Rejected |
T2407-01 |
Building 25 Renovations |
9/5/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2333-01 |
Construct Addition & Existing Building Re-Roof |
9/5/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
M2307-01 |
Replace Boiler and HVAC |
8/29/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2301-02 |
Connect Camp Clark Sewer System to City of Nevada Sewer System |
8/29/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
O2301-01 Bid Pkg #3 |
New Laboratory Campus, Multi Agency, Jefferson City Bid Package #3 - Site Concrete; Masonry; Fireproofing; Roofing; Metal & Specialty Wall Panels; Joint Sealants & Waterproofing; Interior Glass and Glazing; OH Doors, Loading Dock Equipment, Fire Shutter; All bid documents may be viewed HERE All questions should be directed to McCownGordon Construction, Construction Manager At Risk. |
8/28/2024 |
|
|
T2318-01 |
Renovate Interior & Exterior |
8/27/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2336-01 |
Install Air Compressor System |
8/27/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2301-01 Bid Pkg #5 |
New Laboratory Campus, Multi Agency, all bid documents may be viewed HERE(link is external) all questions should be directed to McCownGordon Construction, Construction Manager at Risk. |
8/27/2024 |
Bid Results |
|
O2301-01 Bid Pkg #4 |
New Laboratory Campus, Multi Agency, all bid documents may be viewed HERE(link is external) all questions should be directed to McCownGordon Construction, Construction Manager at Risk. |
8/27/2024 |
Bid Results |
|
M2417-01 |
Replace Roof |
8/15/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2323-02 |
Water System Improvements |
8/15/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
X2310-02 |
Wastewater Spray Irrigation System |
8/13/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2323-03 |
Wastewater System Improvements |
8/8/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2326-01 |
Replace Fire Alarm System, Infrastructure |
8/8/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
M2331-01 |
Replace Roofs |
8/1/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2304-02 |
Water Improvements |
8/1/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
U2301-03 |
HVAC Improvements for Infection Control |
8/1/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
O2324-01 |
Improvements to HVAC |
8/1/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2314-01 |
Replace Fire Alarm System, Infrastructure |
7/30/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
U2302-04 |
Minor Renovations for Infection Control |
7/25/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
T2235-01 |
Roof Replacement, Tuckpointing and Interior Repair |
7/25/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
U2406-01 |
Construct New Columbarium Wall |
7/23/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 |
Bid Results Awarded Contractor |
X2221-01 |
New Premium Campsites
|
7/23/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 |
Bid Results Awarded Contractor |
X2304-03 |
Water and Wastewater Improvements |
7/23/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2316-01 |
Replace 29 Basic Sites with 25 New Premium Sites |
7/18/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2315-01 |
Replace Fire Alarm System, Infrastructure |
7/16/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2332-01 |
Sewer Renovations |
7/16/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2150-01 |
Construct Bellefontaine Readiness Center |
7/11/2024 Invitation for Bid Plans Volume 1, Plans Volume 2 Specifications Volume 1, Specifications Volume 2 |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
X2308-01 |
Marina Wastewater System Improvements |
7/11/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
E2331-01 |
Replace Chiller & Fan Coil Units |
7/9/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X23MP-01 |
Replace Siding |
7/9/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
U2302-03 |
Minor Renovations for Infection Control |
7/9/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2317-01 |
Design & Construct Lagoon Expansion |
6/27/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2302-04 |
Sewer System |
6/27/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2316-01 |
Facility Heating Replacements |
6/27/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
O2301-01 Bid Pkg #2B |
New Laboratory Campus, Multi Agency, Bid Package #2B all bid documents may be viewed HERE all questions should be directed to McCownGordon Construction, Construction Manager at Risk. |
6/27/2024 |
|
|
O2301-01 Bid Pkg #2A |
New Laboratory Campus, Multi Agency,
Jefferson City
Bid Package #2A
Concrete - Elevated Decks
Steel (structural and misc.)
Exterior Glass & Glazing - added via Addendum 1
all bid documents may be viewed HERE all questions should be directed to McCownGordon Construction, Construction Manager at Risk. |
6/27/2024 |
|
|
M2404-01 |
Repair/Replace Pavement Infrastructure |
6/25/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2214-01 |
Replace Roof - Lodge |
6/25/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
U2309-01 |
Improvements to Water and Wastewater Systems Infrastructure |
6/25/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2219-01 |
New Premium Campsites |
6/20/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
O2437-03 |
**PROCUREMENT CANCELLED AS OF 10/31/2024*
Request for Qualifications
Owner's Representative Services
21st Century Missouri State Capitol Restoration Project
Jefferson City
|
6/18/2024 Specifications RFQ |
Addendum #1 |
|
X2302-02 |
Replace Lagoon
|
6/18/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
U2302-01 |
Minor Renovations for Infection Control |
6/18/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2228-01 |
Splash Pad & Associated Infrastructure Improvements |
6/13/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
R2311-01 |
Replace Standby Generator |
6/4/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2306-01 |
Renovation to Exterior/Interior RC Building
|
5/23/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2330-01 |
Replace HVAC System, Third Floor |
5/23/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2302-03 |
Sewage Lift Stations |
5/21/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2001-01 |
Replace Fire & Smoke Detector System |
5/21/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
E2329-01 |
Foundation Stabilization & Waterproofing |
5/21/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
C2310-01 |
Replace Fire Alarm Panels - Multiple Assets |
5/16/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2301-01 Bid Pkg #1 |
New Laboratory Campus, Multi Agency, Jefferson City Bid Package #1 - Building Concrete (footings/foundations, SOG, reinforcing), Earthwork, Caissons, Site Utilities All bid documents may be viewed HERE(link is external) All questions should be directed to McCownGordon Construction, Construction Manager At Risk. |
5/14/2024 |
Bid Results |
|
O2225-01 |
Third Floor Renovations |
5/9/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
C2311-01 |
Replace Roof, Education Building No. 14 |
5/2/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
E1617-02 |
Site Security Upgrade, Site Wide Phase II |
4/25/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
F2403-01 |
Request for Qualifications Design/Build Services, Construct New Maintenance Building Missouri State Fairgrounds Sedalia
|
4/24/2024 Specifications RFQ, Specifications Step 2 Evaluation Results |
Addendum #1 |
Bid Results Awarded Contractor |
O2403-01 |
Renovate Economic Development Offices Suite 770 |
04/18/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
REBID C2223-03 |
REBID CIPP Lining and Replacement of Storm Sewer Piping |
4/18/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
M2011-01 |
Upgrade HVAC Controls Staples Building |
4/16/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 |
Bid Results Awarded Contractor |
M2207-01 |
Retrofit Anti-Ligature Devices |
4/4/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
R2313-01 |
Replace HVAC System |
4/4/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C1921-01 |
Replace Steam, Water and Sewer Lines, Building 3 |
4/2/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
M2013-01 |
Replace Emergency Generator |
3/21/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
F2304-01 |
Upgrade Electrical and Restrooms, Grandstands |
3/21/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
R2310-01 |
Replace Standby Generator |
3/21/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
C2302-01 |
HVAC Improvements, Housing Units 1-2-3 |
3/7/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
F2305-01 |
Construct Electric Vehicle Charging Stations |
2/29/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Rejected |
T2211-01 |
Design & Construct Elevator & Assembly |
2/22/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
E2317-01 |
Upgrade HVAC System |
2/15/2024 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
R2334-01 |
Replace Parking Lot |
2/15/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O1911-01 |
Renovate Mechanical/Electrical/Life Safety |
2/8/2024 Invitation for Bid Plans Volume 1, Plans Volume 2, Plans Volume 3 Specifications Volume 1, Specifications Volume 2, Specifications Volume 3 |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 Addendum #5 |
Bid Results Awarded Contractor |
IDIQMCA-4006 |
Construction Services - Electrical |
2/1/2024 Invitation for Bid Specifications |
Bid Results Awarded Contractor |
|
H2306-01 |
Replace Fire Sprinkler System, Cottage 2 (Bissel Hall) |
1/23/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2306-03 |
Repairs to Storm Water Components |
1/18/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
M1904-01 |
Repair Paving, Infrastructure |
1/18/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
REBID E2010-01 |
REBID Replace HVAC and Controls |
1/18/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2306-02 |
Repairs to Storm Water Components |
1/18/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Rejected |
X2312-01 |
Campsite Renovation and Update |
1/11/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
H2312-01 |
Replace Fire Alarm Systems |
1/4/2024 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2347-01 |
Replace Carpet |
12/21/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
X2205-01 |
Renovate Campground Full Hook-Up Sites |
12/21/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
IDIQMCA-4005 |
Job Order Contract |
12/19/2023 Invitation for Bid Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
F2301-01 |
Request for Qualifications Sedalia Shortlisted Proposers:
Brinkmann Constructors
Curtis Manes Schulte, Inc.
Killian Construction
Nabholz
|
12/15/2023 Specifications RFQ, Specifications Step 2 Evaluation Results |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
C2223-03 |
CIPP Lining and Replacement of Storm Sewer Piping |
12/7/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Rejected |
O2012-01 |
Replace Building Automation System |
12/5/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
REBID F2206-01 |
REBID New Comfort Station |
11/30/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
E2323-01 |
Stormwater Improvements |
11/30/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
REBID C1907-01 |
REBID Replace Sewer Lines and Infrastructure
|
11/16/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
REBID T2209-01 |
REBID Renovate Interior & Exterior |
11/14/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2303-01 |
Rebuild Cooling Tower, Building 7 |
11/2/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
R2314-01 |
Second Floor Annex HVAC Unit Replacement |
11/2/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
M2317-01 |
Replace Generator & Automatic Transfer Switch |
11/2/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2211-01 |
Wastewater Treatment Facility Improvements |
10/26/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
Y2302-01 |
Two Rocks Reclamation Project |
10/24/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2218-01 |
Campground Renovation and Upgrade |
10/19/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
R2318-01 |
Construct CDL Testing Lot |
10/19/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
R2219-01 |
Construct New Headquarters |
10/12/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 |
Bid Results Awarded Contractor |
C2006-01 |
Replace Boilers and Controls |
10/12/2023 Invitation for Bid Plans Volume 1, Plans Volume 2 Specifications Volume 1, Specifications Volume 2 |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 Addendum #5 |
Bid Results Awarded Contractor |
O2203-01 |
Bronze Door Restoration |
10/10/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 |
Bid Results Awarded Contractor |
X2226-01 |
Paved Bike/Pedestrian Trail, Trail Network |
10/5/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
O2325-01 |
Replace Roof System |
10/5/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
IDIQMCA-4004 |
Construction Services |
10/5/2023 Invitation for Bid Specifications |
Bid Results Awarded Contractor |
|
IDIQMCA-4003 |
Construction Services |
10/5/2023 Invitation for Bid Specifications |
No bids received. |
|
O2203-01 RFPQ |
Request for Pre-Qualification for Bronze Door Restoration Specialist See Bid Package O2203-01 for Project Plans, Specifications and Addenda |
9/22/2023 Specifications |
Addendum #1 Addendum #2 |
|
H2303-01 |
Install Emergency Generator |
9/21/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
E2319-01 |
Replace HVAC System |
9/21/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
X2117-01 |
Paved Trail Repair |
9/14/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
T2226-01 |
Renovate USPFO Vault |
9/12/2023 Bid Forms Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2008-01 |
Replace Freezers - Central Services Building |
9/12/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2228-01 |
Install Solar Array |
9/12/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2212-01 |
Upgrade Cave Electric **Mandatory Pre-bid** |
9/7/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 |
Bid Results Awarded Contractor |
T2122-01 |
Renovate Combined Support Maintenance Shop (CSMS) Annex |
8/31/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
T2223-01 |
Replace Courtyard Steps & Add ADA Ramp - USPFO Building |
8/31/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
Y2301-01 |
Fields Creek Reclamation Project |
8/31/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2020-01 |
HVAC Modifications |
8/31/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
O2015-02 |
Replace Roof |
8/31/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2201-01 |
Replace HVAC System |
8/31/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C1907-01 |
Replace Sewer Lines and Infrastructure |
8/24/2023 Invitation for Bid Plans Specifications |
Bid Rejected |
|
IDIQMCA-4002 |
Construction Services |
8/10/2023 Invitation for Bid Specifications |
Bid Results Awarded Contractor |
|
C1904-01 |
HVAC System Upgrade |
8/8/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
IDIQMCA-4001 |
Construction Services - Telecom & Data Wiring |
8/3/2023 Invitation for Bid Specifications |
Bid Results Awarded Contractor |
|
R2308-01 |
Pave Gravel Lot |
8/3/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2312-01 |
Construct Unheated Storage Building |
8/1/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
C2223-02 |
Replace Sewer Screening System |
7/27/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2303-01 |
Renovate Parking Lot and Sidewalk |
7/25/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
REBID C2237-01 |
REBID Replace Floor and Equipment Food Service Building |
7/25/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2225-01 |
Combined Support Maintenance Shop (CSMS) Interior Renovation & Reroof |
7/20/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
Y2304-01 |
South Chaney Reclamation Project |
7/20/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2222-01 |
Construct Direct Current Fast Charging Stations |
7/20/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2042-01 |
Construct Classroom Addition |
7/18/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
T2230-01 |
Repair Range 18A Erosion |
7/18/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2108-01 |
Playground Replacements |
7/13/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
M2311-01 |
Renovate Restrooms |
7/13/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
REBID C2224-01 |
REBID Elevator Replacement |
7/13/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
H2305-01 |
Replace HVAC & Boiler |
7/11/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
X2206-01 |
Six New Full Service Cabins |
6/29/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
T2231-01 |
Construct Solar Array |
6/29/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
T2229-01 |
Construct Solar Array |
6/29/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
T2224-01 |
Construct Solar Array |
6/29/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
T2218-01 |
Auditorium Renovation |
6/27/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2044-01 |
Solar Array, Interior LED and Vehicle Exhaust System |
6/22/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
E2010-01 |
Replace HVAC and Controls |
6/22/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Rejected |
O2301-03 |
New FMDC Grounds & Maintenance Building |
6/15/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
T2126-01 |
Field Maintenance Shop (FMS) Bay Addition |
6/8/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2004-01 |
Replace Roofs - Multiple Assets |
6/1/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2237-01 |
Replace Floor and Equipment Food Service Building |
6/1/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
No bids received. |
O2233-01 |
Multipurpose Building Renovation |
5/25/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2035-01 |
Install Solar Array, LED Lighting and Roof Replacement |
5/25/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2208-01 |
Construct Six New Cabins |
5/18/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
R2221-01 |
Paving Repairs |
5/18/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2202-01 |
Upgrade Electric Network |
5/18/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
E2304-01 |
Replace Fluid Cooler, Wheeler Hall & Administration Building |
5/11/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
X2215-01 |
Replace Five Basic Sites with Five Premium Yurts |
5/4/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
IDIQMCA-3007 |
High Voltage Electrical Services |
5/2/2023 Invitation for Bid Specifications |
Bid Results Awarded Contractor |
|
C2224-01 |
Elevator Replacement |
5/2/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
No bids received. |
X2216-01 |
Replace 22 Electric Sites with 22 Premium Sites |
4/27/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
H2203-01 |
Install Fire Alarm & Suppression Systems |
4/25/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O1914-01 |
Repairs to Structure |
4/20/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
O2010-01 |
Modify HVAC System |
4/20/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
T2208-01 |
Renovate Interior & Exterior |
4/20/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2227-01 |
Replace Highway PP Bridge |
4/18/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
IDIQMCA-3003 |
Construction Services - Telecom & Data Wiring |
4/11/2023 Invitation for Bid Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
IDIQMCA-3006 |
Construction Services - Telecom & Data Wiring |
4/11/2023 Invitation for Bid Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
IDIQMCA-3005 |
Construction Services - Telecom & Data Wiring |
4/11/2023 Invitation for Bid Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
IDIQMCA-3004 |
Construction Services - Telecom & Data Wiring |
4/11/2023 Invitation for Bid Specifications |
Addendum #1 |
No bids received. |
X2203-01 |
Campground Loop 4 Upgrades |
4/6/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
M2015-01 |
Replace Cooling Towers |
4/6/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
R2001-01 |
Radio Tower Replacements |
3/30/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
C2014-01 |
Upgrade HVAC and BAS |
3/30/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
M2315-01 |
Roof Replacements |
3/23/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2209-01 |
Renovate Interior & Exterior
Kennett Readiness Center Building
Kennett, MO
|
3/21/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Rejected |
O2293-01 |
Roadway Improvements
Capitol Circle Drive
Jefferson City, MO
|
3/16/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2321-01 |
Replace Pergola Roof
Governor's Memorial Garden
Jefferson City, MO
|
3/14/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
R2142-01 |
Replace HVAC |
3/14/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2301-01 |
Request for Qualifications
Construction Manager at Risk New Laboratory Campus, Multi-Agency
Jefferson City, MO |
3/10/2023 Specifications |
Addendum #1 |
Awarded Contractor |
X2204-01 |
Campground Loop 5 |
3/9/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2119-01 |
Resurface and Rehabilitate Paved Trail, Phase-1 |
3/9/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C1913-01 |
Replace Roofs - 4 Buildings |
3/9/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
IDIQMCA-3002 |
Construction Services |
3/2/2023 Invitation for Bid Specifications |
Bid Results Awarded Contractor |
|
IDIQMCA-3001 |
Construction Services - HVAC |
3/2/2023 Invitation for Bid Specifications |
Bid Results Awarded Contractor |
|
O1903-01 |
Repair Parking Deck |
2/9/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
X2116-01 |
Gravel Mitigation |
1/19/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2036-01 |
Elevator Replacement |
1/17/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 Addendum #4 |
Bid Results Awarded Contractor |
REBID M1908-01 |
REBID CHANGE IN SCOPE |
1/12/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
C2011-01 |
Upgrade HVAC and BAS |
1/10/2023 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
Y2203-01 |
Hendrich Pit Reclamation Project |
1/10/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
Y2204-01 |
Horn Branch Reclamation Project |
1/10/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
W2001-01 |
Renovate Sub (Acid) Lab |
1/5/2023 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
N2201-01 |
LAN Room-Fire Suppression System Replacement |
12/22/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2010-01 |
Replace BAS and HVAC System, Supervision Center Building |
12/20/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2009-01 |
Replace Ice Builders - Building #13 |
12/20/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Rejected |
C1919-01 |
Closure of Multiple Lagoons and Wells |
12/15/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
E1905-01 |
Replace Rooftop Units |
12/15/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
E1904-01 |
Replace Rooftop Units |
12/15/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
REBID M2005-01 |
REBID Replace Dry Pipe Sprinkler System |
12/8/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C2001-01 |
Replace Kitchen Flooring (3rd Floor) |
12/8/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
H2001-01 |
Replace Fire Sprinkler System, Multiple Assets |
12/6/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
O1920-01 |
Repairs to Exterior Facade |
12/1/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
REBID M2001-01 |
REBID Install Fire Alarm System |
11/22/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
E2107-01 |
Repair Swimming Pool |
11/17/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2109-01 |
Playground Replacement |
11/1/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
M2114-01 |
Electrical Service Replacement, Benton Hall |
11/1/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
F2206-01 |
New Comfort Station |
11/1/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Rejected |
R2302-01 |
Pavement Overlay
|
10/27/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2107-01 |
Electrification Improvement |
10/27/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2245-01 |
Demolition of Gymnasium |
10/25/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2120-01 |
Repair Logan Creek Slide |
10/20/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
X2213-01 |
Replace Wood Roof and Gutters |
10/20/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
U2002-01 |
Replace HVAC System, Administration Building |
9/27/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Rejected |
M1908-01 |
Replace Emergency Generator, Infrastructure |
9/20/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
No bids received. |
T2237-01 |
Expand Parking |
9/15/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2029-01 |
Install Ground Mounted Solar Panel Array & LED Lighting |
9/15/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2137-01 |
Latrine Renovation |
9/13/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2139-01 |
Latrine Renovation |
9/13/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2032-01 |
Install Roof Mounted Solar Panel Array & LED Lighting |
9/8/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
F2205-01 |
Interior & Exterior Renovations Shorthorn Barn |
9/8/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
T2214-01 |
Construct Company Headquarters & Administration Supply Building |
8/25/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
REBID M1903-01 |
REBID CHANGE IN SCOPE |
8/25/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
R2112-01 |
Replace Emergency Generator |
8/25/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2213-01 |
Utility Infrastructure Improvements |
8/25/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
T2041-01 |
Construct New Fitness Center |
8/25/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
T2124-01 |
Construct New 60 Soldier Barracks |
8/25/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
T2128-01 |
Interior and Exterior LED Lighting Upgrade |
7/28/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C1922-01 |
Replace Roof System, Multiple Assets |
7/28/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
C1806-01 |
Wastewater Treatment Facility Improvements |
7/28/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2008-01 |
Upgrade Fire Alarm System |
7/21/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
T2131-01 |
Replacement of Latrine and Shower Facilities |
7/14/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2015-01 |
Repair Building Exterior |
7/14/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 |
Bid Results Awarded Contractor |
X1807-01 |
Water System Improvements |
7/14/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
T2045-01 |
AASF & Cold Storage Hangar LED Lighting, POV and MVC Expansion |
7/12/2022 Invitation for Bid Plans Specifications |
Addendum #1 |
Bid Results Awarded Contractor |
O2040-02 |
Stained Glass Laylight Restoration and Repairs |
7/7/2022 Invitation for Bid Plans Specifications |
Addendum #1 Addendum #2 Addendum #3 |
Bid Results Awarded Contractor |
Y2202-01 |
Franklin Reclamation Project
|
6/23/2022 Invitation for Bid Plans Specifications |
Bid Results Awarded Contractor |